An optimization model for the low-carbon scheduling of an assembly/disassembly production line
Mouna Elouchdi  1@  , Fayçal Belkaid  1@  
1 : Abou Bekr Belkaid University

In the present study, we have investigated the low-carbon scheduling problem of a hybrid production line, in which two workflows (assembly and disassembly tasks) are covered in opposite directions by the processing units. The results of the tests performed on small and medium-sized instances are very promising.


Personnes connectées : 17 Vie privée
Chargement...